جلد 26، شماره 2 - ( 4-1394 )                   جلد 26 شماره 2 صفحات 117-105 | برگشت به فهرست نسخه ها


XML English Abstract Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Mokhtari H, Mozdgir A. A Bi-Objective Approach to an Assembly Line Re-Balancing Problem: Model and Differential Evolution Algorithms. IJIEPR 2015; 26 (2) :105-117
URL: http://ijiepr.iust.ac.ir/article-1-613-fa.html
مختاری هادی، مزدگیر اشکان. A Bi-Objective Approach to an Assembly Line Re-Balancing Problem: Model and Differential Evolution Algorithms. نشریه بین المللی مهندسی صنایع و تحقیقات تولید. 1394; 26 (2) :105-117

URL: http://ijiepr.iust.ac.ir/article-1-613-fa.html


1- ، mokhtari_ie@yahoo.com
چکیده:   (6518 مشاهده)

Assembly lines are special kinds of production systems which are of great importance in the industrial production of high quantity commodities. In many practical manufacturing systems, configuration of assembly lines is fixed and designing a new line may be incurred huge amount of costs and thereby it is not desirable for practitioners. When some changes related to market demand occur, it is worthwhile to re-balance an existing line rather than balancing a new one. Hence, in this paper we suggest a re-balancing model of an existing assembly line in which a new demand related cycle time (CT) is embedded to the traditional assembly line balancing problem (ALBP) as a new parameter. It does not focus on balancing a new line instead it considers a more realistic problem which is re-balancing an existing line. The objective is to re-schedule the tasks in order to reduce the current CT to the new required one such that two criteria are optimized: (i) minimization of the incurred costs and (ii) minimization of non-smoothing of reconfigured line. To solve the considered problem, an effective differential evolution algorithm is developed. Furthermore, to enhance the performance of algorithm, its parameters are optimized by the use of Taguchi method which is a conventional statistical technique for parameter design. The obtained results from computational experiments on benchmark instances show the effectiveness of suggested algorithm against other methods.

AWT IMAGE

     
نوع مطالعه: پژوهشي | موضوع مقاله: فرایندهای تولید و سیستم ها
دریافت: 1393/6/13 | پذیرش: 1394/3/16 | انتشار: 1394/6/1

ارسال نظر درباره این مقاله : نام کاربری یا پست الکترونیک شما:
CAPTCHA

ارسال پیام به نویسنده مسئول


بازنشر اطلاعات
Creative Commons License این مقاله تحت شرایط Creative Commons Attribution-NonCommercial 4.0 International License قابل بازنشر است.

کلیه حقوق این وب سایت متعلق به نشریه بین المللی مهندسی صنایع و تحقیقات تولید می باشد.

طراحی و برنامه نویسی : یکتاوب افزار شرق

© 2024 CC BY-NC 4.0 | International Journal of Industrial Engineering & Production Research

Designed & Developed by : Yektaweb