Back to IUST Research Laboratories Network
Main Menu
Masonry arch bridges::
Steel bridges::
SHM of switches::
Contact us::
::
Search in website

Advanced Search
..
:: Project overview ::

Chief researcher: Dr.Sadegh Marefat

Consulting by IMIRL

Akbar-abad is a 60 years old uninforced concrete arch bridge locaded on Km24+000 of Iranian railway network. The bridge consists of five spans of 6 meters. To determine the ultimate load carrying capacity of the bridge, static and dynamic load tests are carried out on the bridge. The bridge is loaded by upto 500 tons, during static load tests. Deflection of the bridge is recorded in 9 points using deflection meters. During dynamic load tests, a 120 tons locomotive is used, which crossed the bridge with speeds ranging from 10 to 90 km/h.

AWT IMAGE

View: 1686 Time(s)   |   Print: 396 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)
>
Click here to see all texts in Akbarabad topic.
Persian site map - English site map - Created in 0.1 seconds with 45 queries by YEKTAWEB 4665