:: Project overview ::

The bridge on Km 461+500 of Iranian railway network is an old stone masonry arch bridge, which has been in service for about 75 years. The bridge consists of two long spans of 25m, seven spans of 8m, and two smaller spans of 3.5m, totaling a length of 147 meters. The bridge accomodates a single track with an allowable axle load and speed of 20 tons and 60 Km/h, respectively. The bridge is situated in a curved section of the track with a radius of 250 meters. Track's superstructure consists of U33 rails, steel sleepers, and fixed fasteners. 

AWT IMAGE

Summary of results:

The aim of this project was to study the effect of rehabilitation procedures (Ballast cleaning and installing ballast mats) on strcutural response of the bridge. To do so, the bridge is instrumented with 22 sensors and dynamic load tests are carried out in three phases. First one, before any rehabilitation procedures take place, second one, after ballast cleaning, and the last one after installing ballast mats. A total of 76 test runs are carried out through three phases. Results suggest that mid-span deflection remains constant, while acceleration values are reduced significantly.

Keywords: SHM; Rehabilitation procedures; Ballast cleaning; Ballast mats; Before/after study; Dynamic load tests; Masonry arch bridge; |
View: 1354 Time(s)   |   Print: 436 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)

CAPTCHA
   
Related topics Related topics Print version Print version Send to friends Send to friends
Persian site map - English site map - Created in 0.16 seconds with 45 queries by YEKTAWEB 4665