A- International referred journals
1- Bagherpour. M, Noori. S, Cost Management System within Production Environment: A performance based approach, IMECHE, Part B: Journal of Engineering Manufacture, SAGE publication, on-line, 2011. (ISI Index).
2- Yaghoubi. S, Noori. S, Bagherpour. M, Resource allocation in multi-server dynamic PERT networks using multi-objective programming and Markov process, Iranian Journal of Science and Technology, A2: 131-147.2011 (ISI Index).
3- Bagherpour. M, Feylizadeh. MR, Cioffi. D, Time, cost, and quality trade-offs in material requirements planning using fuzzy multi-objective programming, IMECHE, Part B: Journal of Engineering Manufacture, SAGE publication, Accepted for publication, Corrected Proof, 2011. (ISI Index)
4- Rohaninejad. M, Bagherpour. M, Application of Risk Analysis within Value Management: A Case study in Dam Engineering, Journal of Civil Engineering and Management, Accepted for publication, 2011, (ISI Index).
5 - Mahdavi. I, Taghizadeh. K, Bagherpour. M, Soleiman pour. M, Modeling of multi-period multi-product production planning considering production routes, International Journal of Production Research, (IJPR),Taylor and Francis publicatio, Online- 2011. (ISI Index).
6- Taghizadeh. K, Bagherpour. M, Mahdavi. I, Application of Fuzzy Multi-Objective Linear Programming Model in a MPMP problem, International Journal of computational intelligent systems, Vol.4, Issue 2, March 2011. (ISI Index)
7- Zareei. A, Zarepour. F, Bagherpour. M, Noora. AA, Hadi Vencheh, , A new approach for solving fuzzy critical path method using analysis of events, Expert systems with applications, 38 (1), 87-93, 2011, Elsevier. (ISI Index)
8- Saharkhiz. E, Bagherpour. M, Software Performance Evaluation of a Computerized Maintenance Management System: A Statistical Based Comparison, Eksploatacja i Niezawodnosc – Maintenance and Reliability 2012; 14 (1):2011. (ISI Index)
9- Bagherpour. M, A successful project cost management system: Challenges and obstacles to implementation, Cost Management, Sep –Oct, 2010, PP 15- 20. (ISI)
10- Bagherpour. M, An Extension to Earned Value Management, Cost Management, 2011, June – July. (ISI)
11- Feylizadeh. MR, Bagherpour. M, Application of optimization techniques in production planning context, International Journal of manufacturing systems, 2011.
12- Bagherpour. M, Noori S, Sadjadi. SJ, Cost – Time Trade off Models Application to Crashing Flow Shop Scheduling Problems, Lecture Note In Computer Science, Springer-Verlag Berlin, PP 546-553, 2006.
13- Bagherpour. M, Noghondarian. K, Noori. S, Applying Fuzzy Logic to Estimate Setup Times in Sequence Dependent Single Machine Scheduling Problems, International Journal of Computer Science and Network Security, VOL.7 No.1, PP 111-118, January 2007.
14- Bagherpour.M, Zareei. A, Noori. S, Heydari. M, Designing a control mechanism using earned value analysis: An application through production environemnt, The International Journal of Advanced Manufacturing Technology, Spinger- London, 49, 419 - 428, 2010. (ISI Index)
15- Noori. S, Bagherpour. M, Zorriasatine. F, Makui. M, Parkin. RM, A new project scheduling approach for improving multi-product multi-period (MPMP) production planning problems, Institute of mechanical engineers (IMECH), Part B- Journal of Engineering manufacture, Vol. 222, 1517 – 1527. 2008. (ISI Index)
16- Emaeil Abounoori, Morteza Bagherpour, “Industrial cost estimation using neural network, regression analysis or hybrid regression- neural networks”? Iranian Economic Review, Vol 16, PP. 17-29. 2006. (ISC)
17- Noori. S, Bagherpour. M, Zareei. A, 2008, Applying Fuzzy Control Chart in Earned Value Analysis: A New Application, World Applied Sciences Journal 3 (4): 684-690. (ISC)
18- Noori. S, Feylizadeh. MR, Bagherpour. M, Zorriasatine. F, Parkin. R, Optimiztion of MRP using fuzzy multi objective linear programming, Institute of mechanical engineers (IMECH), Part B- Journal of Engineering manufacture, Vol. 222, 887- 900, 2008. (ISI Index)
19- Noori. S, Bagherpour. M, Zorrisatine. F, Designing a control mechanism on MPMP problems by means of earned value, Journal of applied sciences, 8(15), 2008, 1-8, (ISC)
20- Shiekh. S, Bagherpour. M, Estimating the Saturation Thermodynamic Properties of Propene Using a Feed Forward Neural Network, World applied sciences journal, 4 (2), 2008, 169-173, (ISC).
21- Zareei. A, Noori, S, Bagherpour. M, Fuzzy Earned value analysis in production planning problems, Journal of Uncertain Systems, 5 (1), 21-32, 2011. (Scopus)
22- Feylizadeh. MR, Modarres. M, Bagherpour. M, Optimal Crashing of Multi Period-Multi Product Production Planning Problems, World applied sciences Journal, 4 (4), PP.499-505, 2006. (ISC)
23- Zorriasatine. S, Bagherpour. M, A new method in project weight values, 2009, Journal of applied sciences, 9 (5), 917-923, 2009. (Scopus)
24- Mahdavi. I, Taghizadeh. K, Bagherpour. M, An Interactive fuzzy goal programming approach for multi-period multi-product production planning problem, Journal of Fuzzy Information and Engineering (Springer), On-line, 2011.
25- Hedayat. MH, Bagherpour. M, A two level DEA in project based organizations, Management Science Letters 2 (2012) 11–20. (Scopus)
26- Feylizadeh. MR, Hendalianpour, Bagherpour. M, A fuzzy neural network to estimate at completion costs of construction projects, International Journal of Industrial Engineering Computations, 2012, On-line. (ISC)
27- Erjaee.A, Bagherpour. M, Razeghi.S, Dehghani .SM, Imanieh. MH, Haghiat. M, A Multi Criteria Decision Making Mode for Treatment of Helicobacter Pylori Infection In Children, HK journal of pediatrics, 17, 2012, (ISI Index)
28- Mortaji.STH, Bagherpour.M, Noori.S, Fuzzy Earned Value Management Using Fuzzy L-R number, Journal of Intelligent and Fuzzy Systems, USA, DOI: 10.3223.IFS-2012-0556, 24(2):323-332 (2013), (ISI Index)
29- Bagherpour.M, Kamyab Nia. A, Sharifian, Mahdavi Mazdeh.M, Time Driven Activity Based Costing in Production Environments, Institute of mechanical engineers, IMECHE: Part B: Journal of Engineering Manufacture, 2013 vol. 227 no. 2 333-337, (ISI Index)
30- Morteza Bagherpour, Taha Mortaji, M Mahdavi Mazdeh, Fuzzy Time Driven Activity Based Costing, Engineering Management Journal, ( ISI Index), Sep 13, 63-73.
31- Salari. M, Bagherpour M., Kamyabnia. A, Fuzzy Extended earned value management: a novel perspective, Journal of intelligent and fuzzy systems, IOS press, 27(3), 1393- 1406, 2014( ISI Index),]
32- Mortaji, S., Noorossana, R., and Bagherpour, M. (2014). "Project Completion Time and Cost Prediction Using Change Point Analysis." Journal of Management in Eng. 10.1061/(ASCE)ME.1943-5479.0000329. (ISI Index)
33- Feylizadeh Mr., Bagherpour M., Project Cash Flow Forecasting Using Value at Risk, Technical Journal of Engineering and Applied Sciences,3(20),2681-2685, 2013
34- Feylizadeh Mr., Bagherpour M., Sharifi, Sharifi, The effect of claim on construction cash flow, Technical Journal of Engineering and Applied Sciences, 3, 3835-3838, 2013
35- Bagherpour M., Bagherpour MH., Roodani K., Forecasting Gas Production Rate in Underground Gas Reservoirs Using Artificial Neural Networks, Universal Journal of Engineering Science 2(4): 73-76, 2014
36- Bagherpour MH., Bagherpour M., Roodani. K, Underground gas storage in gas condensate reservoir, International Journal of Petroleum and Geoscience Engineering (IJPGE) 2 (2): 130-137, 2014
37- Bagherpour M., Safari M., Sharifi M, Applying mechanical equilibrium rules in project cost management, IMECHE: journal of engineering manufacture, on-line, 2016 (ISI Index)
38- Salari M., Bagherpour M., Wang J., A novel earned value management model using Z-number, International journal of applied decision making, 7(1), 91-116, 2014
39- Kamyab Nia, Bagherpour M.,Risk based earned value management : a novel perspective in software engineering, Int. J. of Industrial and Systems Engineering Vol.17, No.2, pp.170 – 185, 2014.
40- Bagherpour M, Erjaee S., Rasekh A., Dehghani SM., Data Mining Applications in a Medical System, Chapter 55, Encyclopedia of business analytics and optimization, IGI Global, USA.
41- Afshar A., Bagherpour M., Farahmand F., Efficiency Measurement of Clinical Units Using Integrated Independent Component Analysis-DEA Model under Fuzzy Conditions, international journal of hospital research, 2( 3), 108-117, 2013.
42- Salari M., Bagherpour M., Reyhani MH., A Cost -Time Trade-Off Model by incorporating Fuzzy Earned Value Management: A Statistical Based Approach, Journal of intelligent and fuzzy systems, 28 (4), 1909-1919, (ISI Index),2015
43- M Bagherpour, Risky Time Driven Activity Based Costing in a Medical center: A Development, implementation and simulation based optimization approach, The Journal of Accounting and Management 5 (2), 2015
44- S Raeisi, M Bagherpour, Claim Simulation A case study in Piping Projects, International Journal of Mechanical Dynamics & Analysis 1 (2), 09-22, 2015
45- M Safari, M Bagherpour, J Wang, Applying utility theory in uncertain project environments with multiple goals, International Journal of Applied Decision Sciences 9 (2), 196-211,2016
46- V Aminian, A Nejad, S Mortaji, M Bagherpour, A modified earned value management using activity based costing, Journal of Project Management 1 (2), 41-54,2016
47- M Khanzadi, AM Attar, M Bagherpour, Finding Optimum Resource Allocation to Optimizing Construction Project Time/Cost through Combination of Artificial Agents CPM and GA, Periodica Polytechnica. Civil Engineering 60 (2), 169,2016, (ISI Index)
48- MM Sharifi, M Bagherpour, Optimizing Cash-Flow-at-Risk in Construction Projects: A Cost Reduction Approach, Periodica Polytechnica Civil Engineering 60 (3), 337-344, 2016, (ISI Index)
49- A Noroozi, H Mokhtari, M Bagherpour, SJ Sadjadi, A probabilistic portfolio budget allocation problem with CPI index under risk, Journal of Industrial and Production Engineering 33 (4), 236-246, 2016, (ISI Index)
50- A Makui, P Moeinzadeh, M Bagherpour, Developing a Fuzzy Group Decision-Making Approach for Project Manager Selection Considering the Static Complexity of Construction Projects., International Journal of Engineering Science (2008-4870) 27 (3), 2016
51- A Makui, P Moeinzadeh, M Bagherpour, Developing a fuzzy inference approach to evaluate the static complexity of construction projects, Journal of Intelligent & Fuzzy Systems, 1-17,2017, (ISI Index)
52- M Bagherpour, A Erjaee, The Role of Project Management Office in Public Health: A New Approach for Establishment in Iran, Iranian journal of public health 46 (3), 433, 2017(ISI Index)
53- M Rostami, M Bagherpour, MM Mazdeh, A Makui, Resource Pool Location for Periodic Services in Decentralized Multi-Project Scheduling Problems, Journal of Computing in Civil Engineering 31 (5), 2017(ISI Index)
B- International conferences
1- Bagherpour. M, Noori. S, Solimapur. Network modeling approach to a multi assembled production system, Second International conference on simulation, modeling and applied optimization, Abu Dahbi University of petroleum, March 2007, UAE.
2- Bagherpour. M, Noori. S, Ebne Rasoul. SA, Project performance measurement using balanced scorecard, third International project management conference, Tehran, May 2007.
3- Feylizadeh. MR, Arya Nezhad MB, Bagherpour. M, A fuzzy multi objective linear programming application to crashing flow shop scheduling problems, Second international conference on simulation, modeling and applied optimization, Abu Dahbi University of petroleum, March 2007, UAE.
4- Tavakoli Mogaddam. R, Bagherpour. M, Noora A, Sasani, Fuzzy lead time in a material requirement planning system, 8th international conference of fuzzy sets and system, University of British Columbia, Canada .
5- Bagherpour. M, S.M.Ebrahimi, Project weight calculation using AHP analysis with fuzzy criteria, Proceedings of first International conference on simulation, modeling and applied optimization, (2005), Feb.1-3, No.50,PP 1-4 ,Sharjeh, UAE.
6- Iraj Mahdavi, Bagherpour. M, S.M.Ebrahimi The effects of delay due to lotsize in a shop with assembled products, Proceedings of international industrial Engineering conference, Vol.2, PP.90-98, AUT,2004 Tehran, Iran.
7- Iraj Mahdavi, Bagherpour.M, , A.K.Mittlas, A method to solve flow shop scheduling with due date using crashing of critical path, Proceedings of fifth international conference on operations and quantitative management, Vol.2,PP 221-226, Hanyang university, S.Korea,2005.
8- M.H.Bagherpour, Bagherpour. M, Artificial neural network application to revise plan in project management, Proceedings of first international conference on simulation, modeling and applied optimization, (2005), Feb.1-3,No.52,PP 1-4 ,Sharjeh, UAE.
9- Iraj Mahdavi, Bagherpour.M, A.K.Mittals, A method to find common due date in flow shop scheduling problems, Proceedings of second international conference on management, No.101,PP-209- 215,Culcutta, India,2005.
10- S.M.H Hojatti, Bagherpour,M., F. Soliemani, Minimizing make span subject to budget limitation in flow shop scheduling, 35th international conference of computer & industrial engineering, Istanbul, Turkey.
11- Bagherpour.M, Pourya Nikfard, Arash Ghaed Mohammadi, Hybrid Tabu search- neural network application to single machine scheduling with earliness – tardiness penalty, V international conference on system identification & control problems, 31 Jan- 2 Feb 2006, PP 1212-1219.
12- MR.Fiely Zadeh, M.Soliemanpur, Bagherpour.M, Single machine scheduling with earliness – tardiness penalty subject to preventive group replacement, V international conference on system identification & control problems, 31 Jan- 2 Feb 2006, PP 1203-1211.
13- Bagherpour. M, Siamak Noori, Ehsan Parhizgar Quantitative Risk Analysis in a Production Planning Problem,Risk Management International Congress”, Tehran, Iran, 1386.
14- Farzad Manzoori, Bagherpour. M, Manufacturing performance measurement using Data Envelopment Analysis, Proceedings of the 8th International Conference of DEA, 2010.
15- Iraj Mahdavi, Amir H fekri moghaddam, Bagherpour. M, , Flexible route invetigation in a flexible manaufacturing system, IEEE conference on Engineering management, 2009, 2358-2364.
16- Bagherpour M., A closed loop cost control system, International Conference on Economics and Finance Management, Dubai, UAE, 92-96, 2014.
17- Bagherpour M., Risk cost reduction through quantity surveying simulation, 7th conference on quantity surveying, Pretoria, South Africa, 2014.
18- Bagherpour M., Challenges in implementations of cost control system, International project management conference, Tehran, 2014.
19- Bagherpour M., Computer aided cost control: A dashboard system, The second international conference in computer science, Engineering and educational technologies, Malaysia, 2015.
20- MH Reihania, M Bagherpour, A Erjaee, Earned Value management in Public Health: A new horizon In Vaccination planning, IE international conference, Tehran, 2017.
|