<?xml version="1.0" encoding="utf-8"?>
<journal>
<title>international journal of industrial Engineering &amp; Production Research</title>
<title_fa>نشریه بین المللی مهندسی صنایع و تحقیقات تولید</title_fa>
<short_title>IJIEPR</short_title>
<subject>Engineering &amp; Technology</subject>
<web_url>http://ijiepr.iust.ac.ir</web_url>
<journal_hbi_system_id>18</journal_hbi_system_id>
<journal_hbi_system_user>agent2</journal_hbi_system_user>
<journal_id_issn>2008-4889</journal_id_issn>
<journal_id_issn_online>2345-363X</journal_id_issn_online>
<journal_id_pii></journal_id_pii>
<journal_id_doi></journal_id_doi>
<journal_id_iranmedex></journal_id_iranmedex>
<journal_id_magiran></journal_id_magiran>
<journal_id_sid></journal_id_sid>
<journal_id_nlai></journal_id_nlai>
<journal_id_science></journal_id_science>
<language>en</language>
<pubdate>
	<type>jalali</type>
	<year>1387</year>
	<month>9</month>
	<day>1</day>
</pubdate>
<pubdate>
	<type>gregorian</type>
	<year>2008</year>
	<month>12</month>
	<day>1</day>
</pubdate>
<volume>19</volume>
<number>4</number>
<publish_type>online</publish_type>
<publish_edition>1</publish_edition>
<article_type>fulltext</article_type>
<articleset>
	<article>


	<language>en</language>
	<article_id_doi></article_id_doi>
	<title_fa></title_fa>
	<title>A Single Machine Sequencing Problem with Idle Insert: Simulated Annealing and Branch-and-Bound Methods</title>
	<subject_fa>Material Managment</subject_fa>
	<subject>Material Managment</subject>
	<content_type_fa>پژوهشي</content_type_fa>
	<content_type>Research</content_type>
	<abstract_fa></abstract_fa>
	<abstract>&lt;p&gt; &lt;i&gt; In this paper, a single machine sequencing problem is considered in order to find the sequence of jobs minimizing the sum of the maximum earliness and tardiness with idle times (n/1/I/ET&lt;sub&gt;max&lt;/sub&gt;). Due to the time complexity function, this sequencing problem belongs to a class of NP-hard ones. Thus, a special design of a simulated annealing (SA) method is applied to solve such a hard problem. To compare the associated results, a &lt;a name=&quot;OLE_LINK5&quot;&gt;&lt;/a&gt;&lt;a name=&quot;OLE_LINK4&quot;&gt;branch-and-bound &lt;/a&gt;(B&amp;B) method is designed and the upper/lower limits are also introduced in this method. To show the effectiveness of these methods, a number of different types of problems are generated and then solved. Based on the results of the test problems, the proposed SA has a small error, and computational time for achieving the best result is very small. &lt;/i&gt;&lt;/p&gt;</abstract>
	<keyword_fa></keyword_fa>
	<keyword>Single machine sequencing, Earliness/ tardiness, Idle insert, Simulated annealing, Branch-and-bound methods</keyword>
	<start_page>47</start_page>
	<end_page>56</end_page>
	<web_url>http://ijiepr.iust.ac.ir/browse.php?a_code=A-10-1-6&amp;slc_lang=en&amp;sid=1</web_url>


<author_list>
	<author>
	<first_name>R.</first_name>
	<middle_name></middle_name>
	<last_name>TavakoliMoghadam</last_name>
	<suffix></suffix>
	<first_name_fa></first_name_fa>
	<middle_name_fa></middle_name_fa>
	<last_name_fa></last_name_fa>
	<suffix_fa></suffix_fa>
	<email>: tavakoli@ut.ac.ir</email>
	<code>18003194753284600285</code>
	<orcid>18003194753284600285</orcid>
	<coreauthor>Yes
</coreauthor>
	<affiliation></affiliation>
	<affiliation_fa></affiliation_fa>
	 </author>


	<author>
	<first_name>M.</first_name>
	<middle_name></middle_name>
	<last_name>Vasei</last_name>
	<suffix></suffix>
	<first_name_fa></first_name_fa>
	<middle_name_fa></middle_name_fa>
	<last_name_fa></last_name_fa>
	<suffix_fa></suffix_fa>
	<email></email>
	<code>18003194753284600286</code>
	<orcid>18003194753284600286</orcid>
	<coreauthor>No</coreauthor>
	<affiliation></affiliation>
	<affiliation_fa></affiliation_fa>
	 </author>


</author_list>


	</article>
</articleset>
</journal>
