Search published articles


Showing 2 results for Due Date

Mohammad Mahdavi Mazdeh, Ali Khan Nakhjavani , Abalfazl Zareei,
Volume 21, Issue 2 (5-2010)
Abstract

  This paper deals with minimization of tardiness in single machine scheduling problem when each job has two different due-dates i.e. ordinary due-date and drop dead date. The drop dead date is the date in which jobs’ weights rise sharply or the customer cancels the order. A linear programming formulation is developed for the problem and since the problem is known to be NP-hard, three heuristic algorithms are designed for the problem based on Tabu search mechanism. Extensive numerical experiments were conducted to observe and compare the behavior of the algorithms in solving the problem..


Yuri Delano Regent Montororing,
Volume 35, Issue 3 (9-2024)
Abstract

Technological advancements have fueled heightened competition in manufacturing, compelling companies to adopt strategies prioritizing swift, timely, and high-quality customer service. This necessitates seamless integration of supportive systems such as resources, equipment, facilities, and workforce, underscoring the criticality of scheduling in aligning activities and resources for on-time task completion. Scheduling, inseparable from sequencing, is pivotal in optimizing manufacturing and service industries' operations. However, challenges arise when tasks converge with limited facility capacities, necessitating effective resource allocation. By leveraging mathematical techniques and heuristic methods, scheduling optimizes resource utilization, minimizes production costs, and enhances service quality. Despite its significance, existing models often overlook critical aspects like identical job consideration and sequence-dependent setup times, limiting real-world applicability. This research addresses these gaps by proposing robust mathematical models for intricate scheduling requirements. The proposed approach seeks to optimize manufacturing operations by effectively handling complex scheduling needs, thereby minimizing production costs and enhancing operational efficiency. This research endeavours to advance scheduling optimization strategies through real-world implementation and evaluation and contribute to the manufacturing industry's sustainable growth.


Page 1 from 1