Search published articles


Showing 9 results for Fuzzy Set

F. Bagheri , M. J. Tarokh,
Volume 21, Issue 1 (6-2010)
Abstract

Assessment and selection of suppliers are two most important tasks in the purchasing part in supply chain management. Supplier selection can be considered to be a single or multi-objective problem. From another point of view, it can be a single or multi-sourcing problem. In this paper, an integrated AHP and Fuzzy TOPSIS model is proposed to solve the supplier selection problem. This model makes the decision-maker to be able to solve this problem with different criteria and different weight for each criterion with respect to the purchasing strategy. Finally, the proposed model is illustrated by an example.
Mohammad Najafi Nobar, Mostafa Setak,
Volume 21, Issue 1 (6-2010)
Abstract

In nowadays world competitive market, on account of the development of electronic media and its influence on shortening distances, companies require some core competencies in order to be able to compete with numerous competitors in industry and sustain their situation in such a market. In addition companies achieve this target are those which their processes perform great and exploit from competitive price, quality, guarantee, etc. Since some parameters such as price and quality are so dependent on the performance of company supply chain management, so the results can highly impress the final price and quality of products. One of the main processes of supply chain management is supplier selection process which its accurate implementation can dramatically increase company competitiveness. In presented article two layers of suppliers have been considered as a chain of suppliers. First layer suppliers are evaluated by two groups of criteria which the first one encompasses criteria belongs to first layer suppliers features and the second group contains criteria belong to the characteristics of second layer suppliers. One of the criteria is the performance of second layer suppliers against environmental issues. Then the proposed approach is solved by a method combined of concepts of fuzzy set theory (FST) and linear programming (LP) which has been nourished by real data extracted from an engineering design and supplying parts company. At the end results reveal the high importance of considering second layer suppliers features as a criteria for selecting the best supplier.
E. Teimoury, H. Ansari , M. Fathi ,
Volume 22, Issue 1 (3-2011)
Abstract

  The importance of reliable supply is increasing with supply chain network extension and just-in-time (JIT) production. Just in time implications motivate manufacturers towards single sourcing, which often involves problems with unreliable suppliers. If a single and reliable vendor is not available, manufacturer can split the order among the vendors in order to simultaneously decrease the supply chain uncertainty and increase supply reliability. In this paper we discuss with the aim of minimizing the shortage cost how we can split orders among suppliers with different lead times. The (s,S) policy is the basis of our inventory control system and for analyzing the system performance we use the fuzzy queuing methodology. After applying the model for the case study (SAPCO), the result of the developed model will be compared in the single and multiple cases and finally we will find that order splitting in optimized condition will conclude in the least supply risk and minimized shortage cost in comparison to other cases .


Mir. B. Aryanezhad, M.j. Tarokh, M.n. Mokhtarian, F. Zaheri,
Volume 22, Issue 1 (3-2011)
Abstract

  Multiple criteria decision making (MCDM) problem is one of the famous different kinds of decision making problems. In more cases in real situations, determining the exact values for MCDM problems is difficult or impossible. So, the values of alternatives with respect to the criteria or / and the values of criteria weights, are considered as fuzzy values (fuzzy numbers). In such conditions, the conventional crisp approaches for solving MCDM problems tend to be less effective for dealing with the imprecise or vagueness nature of the linguistic assessments. In this situation, the fuzzy MCDM methods are applied for solving MCDM problems. In this paper, we propose a fuzzy TOPSIS (for Order Preference by Similarity to Ideal Solution) method based on left and right scores for fuzzy MCDM problems. To show the applicability of the proposed method, two numerical examples are presented. As a result, our proposed method is precise, easy use and practical for solving MCDM problem with fuzzy data. Moreover, the proposed method considers the decision makers (DMs) preference in the decision making process. It seems that the proposed fuzzy TOPSIS method is flexible and easy to use and has a low computational volume .


Farnad Nasirzadeh, Hamid Reza Maleki, Mostafa Khanzadi, Hojjat Mianabadi,
Volume 24, Issue 1 (2-2013)
Abstract

Implementation of the risk management concepts into construction practice may enhance the performance of project by taking appropriate response actions against identified risks. This research proposes a multi-criteria group decision making approach for the evaluation of different alternative response scenarios. To take into account the uncertainties inherent in evaluation process, fuzzy logic is integrated into the revaluation process. To evaluate alternative response scenarios, first the collective group weight of each criterion is calculated considering opinions of a group consisted of five experts. As each expert has its own ideas, attitudes, knowledge and personalities, different experts will give their preferences in different ways. Fuzzy preference relations are used to unify the opinions of different experts. After computation of collective weights, the best alternative response scenario is selected by the use of proposed fuzzy group decision making methodology which aggregates opinions of different experts. To evaluate the performance of the proposed methodology, it is implemented in a real project and the best alternative responses scenario is selected for one of the identified risks.
Ahmad Makui, Pooria Moeinzadeh, Morteza Bagherpour,
Volume 27, Issue 3 (9-2016)
Abstract

Due to the particular importance of projects in human life and in organizations, proper project management has been always regarded highly by researchers and practitioners. Recent advances in technology and fundamental changes in most scientific areas have affected projects and made their nature and environmental circumstances much more complex than in the past. Fortunately, in recent years, many scholars have recognized the importance of complexity in modern project management and tried to identify its various aspects. Furthermore, one of the main factors for a project’s success is the assignment of an appropriate project manager. Many studies have been done about project managers' competencies and the selection methods of a suitable project manager. In most of these researches, the amount and type of project complexity have been explained as influential factors for determining the competent project manager. However, a specific approach for project manager selection considering the complexity of projects is not provided yet. Hence, in this paper we try to design and implement a fuzzy group decision making approach to allocate the best project manager taking into account the project complexity. Also, owing to the importance of construction projects in the development of countries' basic infrastructures, we exclusively studied this kind of projects. Finally, it should be noted that from the viewpoint of complexity theory, system complexity can exist in two forms: static and dynamic. Therefore, considering the breadth of issues related to each of these two complexity areas, just the static complexity of construction projects has been studied here.


Seyed Erfan Mohammadi, Emran Mohammadi,
Volume 31, Issue 3 (9-2020)
Abstract

Today due to the globalization and competitive conditions of the market, decisions are generally made in group and in accordance with different attributes. In addition, all of the information is associated with uncertainty. In such situation, the emergence of inconsistency and facing with the contradictions will be obvious. Having regarded this fact, the development and application of tools that adequately address the uncertainty in decision making process and also be appropriate for group decision making is an important area of multi-criteria decision making (MCDM). Therefore, in this paper, firstly we developed the traditional best-worst method (BWM) and proposed an interval-valued intuitionistic fuzzy best-worst method (IVIFBWM), then introduced a novel approach for fuzzy multi-attribute group decision making based on the proposed method. Finally, in order to demonstrate how the introduced approach can be applied in practice, it is implemented in an Iranian investment company and the experimental results are examined. From the experimental results, we can extract that not only the introduced approach is simple in calculation but also it is convenient in implementation especially in interval-valued intuitionistic fuzzy environments.
Salim Karimi Takalo, Hossein Sayyadi Tooranloo, Sepideh Saghafi,
Volume 32, Issue 4 (12-2021)
Abstract

Innovation is an essential tool for the supply chain to gain its competitive advantage and improve its performance. Many researchers have remarked that supply chain innovation is a vital tool for improving the performance of a supply chain and can be very productive. This research attempts to identify and analyze the effective factors on the innovation supply chain in the health sector. The effective factors on the innovative supply chain were extracted by reviewing the literature, similar studies, and experts’ surveys. In this regard, 49 criteria were determined in eight dimensions. Intuitive fuzzy DEMATEL (IFD) and AHP methods were used to determine the weight and the relationships between them. The results indicated organizational innovation as the most important dimension, government support innovation as the most effective dimension, and process innovation as the most affected dimension. Some researchers believe that this period guarantees the survival and success of service organizations in this competition. However, the logistics and communication network of a business is required as a new and innovative landscape to use the competitive advantage opportunities to perceive the global era.
Amir Mohamadghasemi, Abdollah Hadi-Vencheh, Farhad Hosseinzadeh Lotfi,
Volume 32, Issue 4 (12-2021)
Abstract

Preventive maintenance (PM) of machines has the critical role in a factory or enterprise. It decreases number of failures, increases reliability, as well as minimizes costs of production systems.  The managers’ duty of maintenance section is to prioritize machines and then, implement PM programs for them. Since machines have the different measures with respect to the maintenance costs, reliability, mean time between failures (MTBF), availability of spare parts, etc., the machines evaluation problem can be considered as a multiple criteria decision-making (MCDM) problem. Accordingly, the MCDM techniques can be applied to solve them. The aim of this paper is to extend the ELECTRE III (eLimination et choix traduisant la realite´– elimination and choice translation reality) method to interval type-2 fuzzy sets (IT2FSs) using curved (such as Gaussian) membership functions (MFs). The extended ELECTRE III methodology is then utilized to a maintenance group MCDM (GMCDM) matrix including the quantitative and qualitative criteria. In the proposed approach, the criteria weights, the assessment of alternatives with respect to criteria, and the thresholds are stated with Gaussian interval type-2 fuzzy sets (GIT2FSs). In order to show the effectiveness and applicability of the proposed approach, a case study and an illustrative example are exhibited using real decision-making problems. Due to the high correlation coefficients between our method and the others, as well as the results obtained by the proposed method, it can be taken into account as a valid and reliable approach to prioritize machines for PM.

Page 1 from 1