Showing 3 results for Fallahnezhad
Mohammad Saber Fallahnezhad, Hasan Hosseini Nasab,
Volume 22, Issue 3 (IJIEPR 2011)
Abstract
Mehdi Kabiri Naeini, Mohammad Saleh Owlia, Mohammad Saber Fallahnezhad,
Volume 23, Issue 3 (IJIEPR 2012)
Abstract
In this research, an iterative approach is employed to recognize and classify control chart patterns. To do this, by taking new observations on the quality characteristic under consideration, the Maximum Likelihood Estimator of pattern parameters is first obtained and then the probability of each pattern is determined. Then using Bayes’ rule, probabilities are updated recursively. Finally, when one of the updated derived statistics falls outside the calculated control interval a pattern recognition signal is issued. The advantage of this approach comparing with other existing CCP recognition methods is that it has no need for training. Simulation results show the effectiveness and accuracy of the new method to detect the abnormal patterns as well as satisfactory results in the estimation of pattern parameters.
Samrad Jafarian-Namin, Mohammad Saber Fallahnezhad, Reza Tavakkoli-Moghaddam, Ali Salmasnia, Mohammad Hossein Abooei,
Volume 32, Issue 4 (IJIEPR 2021)
Abstract
In recent years, it has been proven that integrating statistical process control, maintenance policy, and production can bring more benefits for the entire production systems. In the literature of triple-concept integrated models, it has generally been assumed that the observations are independent. However, the existence of correlated structures in some practical applications put the traditional control charts in trouble. The mixed EWMA-CUSUM (MEC) control chart and the ARMA control chart are effective tools to monitor the mean of autocorrelated processes. This paper proposes an integrated model subject to some constraints for determining the decision variables of triple concepts in the presence of autocorrelated data. Three types of autocorrelated processes are investigated to study their effects on the results. Moreover, the results of the MEC and ARMA charts are compared. Due to the complexity of the model, a particle swarm optimization (PSO) algorithm is applied to select optimal decision variables. An industrial example and extensive comparisons are provided