Search published articles


Showing 6 results for Khanzadi

M. Khanzadi, G. Ghodrati Amiri, G. Abdollahzadeh Darzi,
Volume 5, Issue 1 (March 2007)
Abstract

According to performance-based seismic design method by using energy concept, in this paper it is tried to investigate the duration and damping effects on elastic input energy due to strong ground motions. Based on reliable Iranian earthquake records in four types of soils, structures were analyzed and equivalent velocity spectra were computed by using input energy. These spectra were normalized with respect to PGA and were drawn for different durations, damping ratios and soil types and then effects of these parameters were investigated on these spectra. Finally it was concluded that in average for different soil types when the duration of ground motions increases, the input energy to structure increases too. Also it was observed that input energy to structures in soft soils is larger than that for stiff soils and with increasing the stiffness of the earthquake record soil type, the input energy decreases. But damping effect on input energy is not very considerable and input energy to structure with damping ratio about 5% has the minimum value.
Farnad Nasirzadeh, Abbas Afshar, Mostafa Khanzadi,
Volume 6, Issue 2 (June 2008)
Abstract

Presence of risks and uncertainties inherent in project development and implementation plays

significant role in poor project performance. Thus, there is a considerable need to have an effective risk

analysis approach in order to assess the impact of different risks on the project objectives. A powerful risk

analysis approach may consider dynamic nature of risks throughout the life cycle of the project, as well as

accounting for feedback loops affecting the overall risk impacts. This paper presents a new approach to

construction risk analysis in which these major influences are considered and quantified explicitly. The

proposed methodology is a system dynamics based approach in which different risks may efficiently be

modeled, simulated and quantified in terms of time, cost and quality by the use of the implemented object

oriented simulation methodology. To evaluate the performance of the proposed methodology it has been

employed in a bridge construction project. Due to the space limitations, the modeling and quantification

process for one of the identified risks namely “pressure to crash project duration” is explained in detail.


Mostafa Khanzadi, Seyed Mehdi Tavakkoli,
Volume 9, Issue 3 (September 2011)
Abstract

An evolutionary structural optimization (ESO) method is used for plastic design of frames. Based on safe theorems some criteria are derived and made an effort to satisfy them during the optimization process. In this regard, equilibrium is checked and yield condition is gradually satisfied during the optimization process. In this method, the amount of used material and the stiffness for each element are improved, simultaneously, to impose upper bound of moment in the element. Frame analysis and optimization algorithm are implemented as PLADOF (PLAstic Design of Frames) computer code. Four examples are presented to illustrate the performance of the algorithm


F. Nasirzadeh, M. Khanzadi, A. Afshar, S. Howick,
Volume 11, Issue 1 (TransactionA: Civil Engineering, March 2013)
Abstract

This research presents a dynamic mathematical system for modeling and simulating the quality management process in construction projects. Through sets of cause and effect feedback loops, all factors that internally and externally affect the quality management process are addressed. The proposed system integrates fuzzy logic with system dynamics simulation scheme to consider the uncertainties associated with the model parameters and estimation of the extra cost and time due to quality defects. Quantification of the consequences of the quality failures is performed based on the α-cut representation of fuzzy numbers and interval analysis. The proposed approach is efficient in modeling and analyzing a quality management process which is complex and dynamic in nature and involves various uncertainties. The proposed approach is implemented in a real submarine water supply pipe line project in order to evaluate its applicability and performance. The negative impacts resulting from quality failures are simulated. These negative impacts are mitigated by the implementation of alternative solutions.
Ali Kaveh, Mstafa Khanzadi, M. Alipour,
Volume 14, Issue 5 (Transaction A: Civil Engineering 2016)
Abstract

Resource allocation project scheduling problem (RCPSP) has been one of the challenging subjects amongst researchers in the last decades. Most of the researches in this scope have used deterministic variables, however in a real project activities are exposed to risks and uncertainties that cause to delay in project’s duration. There are some researchers that have considered the risks for scheduling, however, new metahuristics are available to solve this problem for finding better solution with less computational time. In this paper, two new metahuristic algorithms are applied for solving fuzzy resource allocation project scheduling problem (FRCPSP) known as charged system search (CSS) and colliding body optimization (CBO). The results show that both of these algorithms find reasonable solutions, however CBO finds the results in a less computational time having a better quality. A case study is conducted to evaluate the performance and applicability of the proposed algorithms.


Shahin Dabirian, Mostafa Khanzadi, Reza Taheriattar,
Volume 15, Issue 8 (Transaction A: Civil Engineering 2017)
Abstract

The study has been developed a qualitative System Dynamics model to measure sustainability performance of construction project, considering contractors’ tendency to productivity. Construction contractors do not have a clear understanding of sustainability especially in developing countries. However, they welcome higher productivity as a determinant parameter in scheduling and financial success of construction project. Therefore, construction productivity improvement can be employed as an incentive to persuade contractors for implementing sustainability mechanisms in construction project. Sustainability performance has been examined in three aspects of economic, social and environmental by introducing different subsystems and feedback loops. These loops are based on the causal links among the factors affecting construction sustainability and productivity. The findings provide a proper basis for both practitioners and researchers through illustrating the cohesion between productivity and sustainability.



Page 1 from 1     

© 2024 CC BY-NC 4.0 | International Journal of Civil Engineering

Designed & Developed by : Yektaweb