[Home ]   [ فارسی ]  
Main Menu
SRE::
Railway Academy::
Education::
Research::
People::
Facilities::
News::
Subset::
Contact us::
::
Journal
AWT IMAGE
..
Brochure

Brochure  of School of Railway Engineering

..
Defence Sessions
..
Search in website

Advanced Search
..
Polling
How do you evaluate this site?
Excellent
Good
Average
Poor
   
..
About Iran

AWT IMAGE

..
:: Izadkhast Bridge ::
 | Post date: 2016/10/31 | 

- Bridge monitoring (Izadkhast Bridge)

- Monitoring of Veresk Bridge

- Switch Monitoring

View: 920 Time(s)   |   Print: 284 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)
>
:: 21-06-2016 ::
 | Post date: 2016/09/17 | 

Completed bridge load test projects are as following

1-Bridge-monitoring-Veresk

2-Pad-influence-bridge461

3-Switch-monitoring-Yatri

View: 863 Time(s)   |   Print: 297 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)
>
:: The Test Tove and 1035 Bridge ::
 | Post date: 2016/04/27 | 

1- Structural Health Monitoring and Dynamic Load Testing of Tove Bridge

2- Structural Health Monitoring and Dynamic Load Testing of 1035 bridge

View: 1117 Time(s)   |   Print: 440 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)
>
:: the bridge test ::
 | Post date: 2016/01/27 | 

Completed bridge load test projects are as following:

1-Neka Bridge Load test- as Built Dimension

2- Neka Bridge Load Test-Framework Mounting

3- Neka Bridge Load Test-Accelerometer Installation

4- Neka Bridge Load Test-LVDT Installation

5- Neka Bridge Load Test-Straingauge Installation

 6- Neka Bridge Load Test-Data Logger Setting

7- Neka Bridge Load Test-Sensor Calibration

View: 1169 Time(s)   |   Print: 446 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)
>
:: bridge load test-1 ::
 | Post date: 2016/01/26 | 

Completed bridge load test projects are as following:

1-Bridge-Load Test-Ghotour

2-Bridge-Load Test-Km475

3-Bridge-Load Test-Km487

4-Bridge-Load Test-Km564

5-Bridge-Load Test-S

6-Bridge-Load Test-Shahbazan

View: 1171 Time(s)   |   Print: 441 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)
>
:: Bridge Load Test ::
 | Post date: 2015/07/12 | 

Completed bridge load test projects are as following:

  • Ghalemorghi Bridge Load Test

  • Ghotour Bridge Load Test

         2- Neka Bridge Load Test-Framework Mounting

         3- Neka Bridge Load Test-Accelerometer Installation

         4- Neka Bridge Load Test-LVDT Installation

         5- Neka Bridge Load Test-Straingauge Installation

         6- Neka Bridge Load Test-Data Logger Setting

         7- Neka Bridge Load Test-Sensor Calibration

         8- Neka Bridge Load Test-Surveying

         9- Neka Bridge Load Test-Static Load Test

         10- Neka Bridge Load Test-Dynamic Load Test

         11- Neka Bridge Load Test-Impact Test

View: 1789 Time(s)   |   Print: 608 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)
>
:: Other articles: ::
:: the bridge test - -
:: bridge load test-1 - -
:: Bridge Load Test - -
کلیه حقوق مادی و معنوی این سایت متعلق به دانشکده مهندسی راه آهن دانشگاه علم و صنعت ایران می باشد. استفاده از مطالب آن با ذکر منبع بلامانع می باشد.
Persian site map - English site map - Created in 0.41 seconds with 87 queries by YEKTAWEB 3980