Search published articles


Showing 2 results for Lork

D. Sedaghat Shayegan, A Lork, S.a.h. Hashemi,
Volume 9, Issue 3 (6-2019)
Abstract

In this paper, the optimum design of a reinforced concrete one-way ribbed slab, is presented via recently developed metaheuristic algorithm, namely, the Mouth Brooding Fish (MBF). Meta-heuristics based on evolutionary computation and swarm intelligence are outstanding examples of nature-inspired solution techniques. The MBF algorithm simulates the symbiotic interaction strategies adopted by organisms to survive and propagate in the ecosystem. This algorithm uses the movement, dispersion and protection behavior of Mouth Brooding Fish as a pattern to find the best possible answer. The cost of the system is considered to be the objective function, and the design is based on the American Concrete Institute’s ACI 318-08 standard. The performance of this algorithm is compared with harmony search (HS), colliding bodies optimization (CBO), particle swarm optimization (PSO), democratic particle swarm optimization (DPSO), charged system search (CSS) and enhanced charged system search (ECSS). The numerical results demonstrate that the MBF algorithm is able to construct very promising results and has merits in solving challenging optimization problems.
S. S. Shahebrahimi, A. Lork, D. Sedaghat Shayegan,
Volume 12, Issue 2 (4-2022)
Abstract

In this study the challenges of managing the civil projects in oil and gas industry over recent years that failed were investigated. For this purpose, the relevant cases and their effectiveness were categorized by analyzing research data obtained from the questionnaire results. The results obtained from the research showed that there is a positive and significant relationship between the project management knowledge and reduction in the challenges. Lack of attention to the project's feasibility study before starting the project, adverse risks at the beginning and end of the projects, proper knowledge of contracts, and the project team's skill are the items that will fail the project if they are not appropriately managed. Since the team's correct design and the key persons of the project and before that feasibility and the necessity of doing it in vital projects in the country are very important and in such a way, the two components studied in this research are derived from the risk management of projects. Considering the importance of this issue as a case study, these cases were investigated in gas pipeline projects in Fars province.
 

Page 1 from 1     

© 2023 CC BY-NC 4.0 | Iran University of Science & Technology

Designed & Developed by : Yektaweb