M.h. Sebt, E. Parvaresh Karan, M.r. Delavar,
Volume 6, Issue 4 (12-2008)
Abstract

Geographic information systems (GIS) are one of the fastest growing computer-based technologies of past two decades, yet, full potential of this technology in construction has not been realized. Based upon GIS capabilities, construction site layout is one of the areas that GIS could be applied. The layout of temporary facilities (TFs) such as warehouses, fabrication shops, maintenance shops, concrete batch plants, construction equipments, and residence facilities has an important impact on the cost savings and efficiency of construction operations, especially for large projects. The primary objectives of this paper are to describe GIS technology and to present application of GIS technology to construction site layout. The study also delineated the methods of location TFs in construction site. An example application of GIS to location optimization of tower crane and concrete batch plant is provided to demonstrate GIS capabilities as compared with previous models. The spatial and nonspatial data which used in construction site layout process are analyzed and arranged on GIS environment and results showed the GIS can solve site layout problem. Finally, areas of additional research are noted.
Xiaoling Song, Jiuping Xu, Charles Shen, Feniosky Peña-Mora,
Volume 15, Issue 2 (3-2017)
Abstract

The construction temporary facilities layout planning (CTFLP) requires an identification of necessary construction temporary facilities (CTFs), an identification of candidate locations and a layout of CTFs at candidate locations. The CTFLP is particularly difficult and complex in large-scale construction projects as it affects the overall operation safety and effectiveness. This study proposes a decision making system to decide on an appropriate CTFLP in large-scale construction projects (e.g. dams and power plants) in a comprehensive way. The system is composed of the input, CTF identification, candidate location identification, layout optimization, evaluation and selection, as well as output stages. The fuzzy logic is employed to address the uncertain factors in real-world situations. In the input stage, the knowledge bases for identifying CTFs and candidate locations are determined. Then, CTFs and candidate locations are identified in the following two stages. In the mathematical optimization stage, a multiobjective mathematical optimization model with fuzzy parameters is established and fuzzy simulation-based Genetic Algorithm is proposed to obtain alternative CTFLPs. The intuitionistic fuzzy TOPSIS method is used to evaluate and select the most satisfactory CTFLP, which is output in the last stage. To demonstrate the effectiveness and efficacy of the proposed method, the CTFLP for the construction of a large-scale hydropower dam project is used as a practical application. The results show that the proposed system can assist the contractor to obtain an appropriate CTFLP in a more efficient and effective manner.



Page 1 from 1     

© 2020 All Rights Reserved | International Journal of Civil Engineering

Designed & Developed by : Yektaweb